Justin Wisteria 3

New Construction of Cold Storage Building

  • 109,474 square feet
  • Pre-Engineered Metal Building
  • Paso Robles, CA

The project features a pre-engineered, single-story metal building spanning 109,474 square feet, situated on a 12.44-acre site. The facility is the third constructed on this site and offers over 100,000 square feet of dedicated wine barrel storage. The facility also includes a loading dock, office, restrooms, break room and a shipping/receiving area. Through close collaboration with our client and a commitment to quality craftsmanship, we delivered a facility tailored to their specific operational needs. Our team takes great pride in this accomplishment, which we’re confident will support Justin Wisteria 3’s continued growth and wine production for years to come.